FEBRUARY 14-16, 2023 | Long Beach, CA   Register Now

THE VILLAGE OF MINSTER ENERGY STORAGE PROJECT

Minster, Ohio

Project Info

Project Description

Rated Power: 7 MW
Rated Capacity: 3 MWh
Technology Type: 
Powered by: S&C Electric Company, Half Moon Ventures, PJM
Services Provided: Frequency regulation services, transmission and distribution deferral, demand response services

The Village of Minster Energy Storage Project is one of the largest U.S. facilities of its kind connected through a municipal utility. The 7-MW, 3 MWh system, co-located with a 4.2 MW solar plant, is capable of providing multiple revenue streams (that flow to multiple parties) by integrating frequency regulation services, transmission and distribution deferral, and demand response services.

More Info: http://www.energystorageexchange.org/projects/1908

© Diversified Communications. All rights reserved.