FEBRUARY 14-16, 2023 | Long Beach, CA   Register Now

SNOPUD MESA 1 PROJECT

Everett, Washington

Project Info

Project Description

Rated Power: 2 MW
Rated Capacity: 1 MWh
Technology Type: 
Powered by: Doosan GridTech, LG Chem, ESS Inc., Mitsubishi/GS-Yuasa, Parker-Hannifin, and more
Services Provided: Electric Energy Time Shift, Load Following (Tertiary Balancing), Renewables Capacity Firming, Voltage Support

Snohomish County Public Utility District (SNOPUD) and Doosan GridTech partnered to develop and deploy an innovative approach to energy storage, aimed at helping electric utilities increase their use of renewable energy and improve overall reliability. The MESA-1 installation is the first energy storage system built on the Modular Energy Storage Architecture (MESA), an innovative approach to energy storage based on open, non-proprietary industry standards. The system is also completely integrated with utility operations via the GE/Alstom eTerra SCADA system. Finally, the system is dispatched by a fleet scheduling system from Doosan GridTech called the Distributed Energy Resource Optimizer (DERO). MESA-1 comprises two sub-projects (MESA-1a and MESA-1b) at one substation site, both managed by a single instance of the Doosan GridTech Intelligent Controller.

More Info: http://www.energystorageexchange.org/projects/289

© Diversified Communications. All rights reserved.