FEBRUARY 14-16, 2023 | Long Beach, CA   Register Now

SCE DISTRIBUTION ENERGY STORAGE INTEGRATION (DESI) PILOT 1

Orange, CA

Project Info

Project Description

Rated Power: 2.4 MW
Rated Capacity: 3.9 MWh
Technology Type: Array
Powered by: Southern California Edison, NEC Energy Solutions, Dynapower
Services Provided: T&D Deferral

The Distribution Energy Storage Integration (DESI) Pilot 1 uses a 2.4MW, 3.9MWh lithium-ion battery system from NEC Energy Solutions to support a local Southern California Edison (SCE) distribution circuit in Orange, California. Located in a compact easement on a private industrial property, DESI 1 addresses intermittent circuit overloads.

More Info: http://www.energystorageexchange.org/projects/1707