HYDROSTOR GODERICH A-CAES FACILITY

Goderich, Ontario

Project Info

Project Description

Rated Power: 1,750 kW
Rated Capacity: 15,000 kWh
Technology Type: Compressed Air
Company: Hydrostor
Powered by: IESO
Services Provided: Peaking Capacity, Peak Electricity Supply, Ancillary Services

The Goderich A-CAES Facility is a commercial energy storage plant, located in Goderich, Ontario, Canada which utilizes Hydrostor’s proprietary Advanced Compressed Air Energy Storage (A-CAES) technology, a long-duration, emissions-free energy storage solution. The facility is contracted by Ontario’s Independent Electricity System Operator (IESO) for peaking capacity, ancillary services, and full participation in the merchant energy market. The 1.75 MW peak output, 2.20 MW charge rating, and up to 15 MWh storage capacity plant (contracted to 7 MWh) is a utility-scale commercial application of the technology and the largest fuel-free (adiabatic) CAES system in the world, conforming to all interconnection, uptime, performance and dispatch requirements/standards as set out by the IESO. The facility, operational in September 2019, proves the ability of A-CAES technology to participate in an advanced electricity market and to provide a range of grid services, including clean, dispatchable capacity in support of enhanced system flexibility and resiliency.

Project Hashtag: #HYDROSTOR_ESNA

© Diversified Communications. All rights reserved.